New construction of a branch line, BMW-Steyr
> 2003 > Extensive earthwork for the production of a subgrade formation > Removal of 195 metres of track > Laying of 560 metres of cross sleeper track on concrete sleepers, ballast grain size II > Installation of 2 turnouts and 320 metres of paved track